Quality
A Kaizen floor. Not a Kaizen poster.
IATF 16949 certified. Eight disciplines run as daily routine. Six layers of inspection between the bar stock and the despatch dock.

Section 01
The eight disciplines.
Each is owned by a named team lead and audited against the IATF control plan.
01
PPAP
Mass-production items approved through Production Part Approval Process.
02
APQP
Cross-functional teams driving APQP with PFMEAs, control plans and MSA for new programs.
03
Training
Supervisors and operators briefed on PFMEAs, control plans and work instructions.
04
Methods
5S, SQC & SPC, Kaizen, Poka-Yoke as daily practice — not as posters.
05
Defect elimination
Rejects and rework analysed to establish Poka-Yokes that prevent recurrence.
06
Gage control
Systematic calibration and periodic Gage R&R studies.
07
Tool management
Tool-quality control with active tool-life monitoring.
08
Preventive maintenance
Daily checks and scheduled maintenance for every machine.
Section 02
Six layers of inspection.
From operator self-check to third-party audit. A defect would have to slip past all six.
01
Operator
Self-inspection at the machine, every part.
02
QA in-process
Dedicated QA on the floor during production.
03
QA final
Final inspection by QA before despatch.
04
Internal audits
Scheduled audits against IATF control plans.
05
Supplier audits
Incoming-material and supplier-system audits.
06
Third party
IATF certifying body and customer audits.
Certifications